diff --git a/PLAN.md b/PLAN.md index 715d4a8..ea0e677 100644 --- a/PLAN.md +++ b/PLAN.md @@ -13,7 +13,7 @@ Every new agent session must read this file together with `PROGRESS.md` before p - If an item becomes obsolete, move it to `PROGRESS.md` with a short reason instead of silently deleting it. ## Current Objective -Continue the new Phase 1 rebaseline plan in `phases/1-linear-static-mitc4-rebaseline`, starting with P1R-15 independent evaluator closeout. The old `phases/1-linear-static-mitc4` path is historical and superseded by the paper-based MITC4 formulation reset. +The `phases/1-linear-static-mitc4-rebaseline` execution path is complete through P1R-15. Continue by closing the remaining product-level Phase 1 reference gaps before claiming the full PRD Phase 1 Definition of Done. The old `phases/1-linear-static-mitc4` path is historical and superseded by the paper-based MITC4 formulation reset. ## Required Reading For New Agents 1. `AGENTS.md` @@ -33,10 +33,10 @@ Continue the new Phase 1 rebaseline plan in `phases/1-linear-static-mitc4-rebase 15. `phases/1-linear-static-mitc4-rebaseline/index.json` 16. `phases/1-linear-static-mitc4/index.json` for historical context only -## Active Phase Files -- Active phase directory: `phases/1-linear-static-mitc4-rebaseline` -- Execute with: `python scripts/execute.py 1-linear-static-mitc4-rebaseline` -- Step numbering is zero-based. `step0.md` is complete and recorded in `phases/1-linear-static-mitc4-rebaseline/step0-audit.md`; `step1.md` is complete and created the `quad_02_phase1.inp` normalized reference path; `step2.md` is complete and revalidated core harness guardrails; `step3.md` is complete and revalidated the Phase 1 parser/domain subset; `step4.md` is complete and strengthened validation/singular diagnostics; `step5.md` is complete and revalidated the DofManager/reaction foundation; `step6.md` is complete and revalidated the minimum result model plus displacement CSV comparator; `step7.md` is complete and revalidated MITC4 natural coordinates, tying points, center directors, and integration bases; `step8.md` is complete and revalidated degenerated-continuum displacement, direct covariant strain rows, and MITC shear tying rows; `step9.md` is complete and revalidated plane-stress material, convected-to-local transform, and `2 x 2 x 2` material integration scaffolding; `step10.md` is complete and revalidated MITC4 stiffness, internal force, six-DOF transform, and drilling stabilization; `step11.md` is complete and added MITC4 membrane, bending, shear, twist, drilling-sensitivity, and thin-cantilever locking-sensitivity tests; `step12.md` is complete and revalidated full-space assembly, reduced projection, deterministic sparse-pattern scaffold, solver adapter injection, and full-vector internal/reaction force state; `step13.md` is complete and revalidated active AnalysisModel construction plus input-to-AnalysisState-to-U/RF result workflow; `step14.md` is complete and added the first stored Abaqus displacement regression for `quad_02_phase1`; `step15.md` is the independent evaluator closeout. +## Phase Files +- Completed phase directory: `phases/1-linear-static-mitc4-rebaseline` +- Historical execution command: `python scripts/execute.py 1-linear-static-mitc4-rebaseline` +- Step numbering is zero-based. `step0.md` is complete and recorded in `phases/1-linear-static-mitc4-rebaseline/step0-audit.md`; `step1.md` is complete and created the `quad_02_phase1.inp` normalized reference path; `step2.md` is complete and revalidated core harness guardrails; `step3.md` is complete and revalidated the Phase 1 parser/domain subset; `step4.md` is complete and strengthened validation/singular diagnostics; `step5.md` is complete and revalidated the DofManager/reaction foundation; `step6.md` is complete and revalidated the minimum result model plus displacement CSV comparator; `step7.md` is complete and revalidated MITC4 natural coordinates, tying points, center directors, and integration bases; `step8.md` is complete and revalidated degenerated-continuum displacement, direct covariant strain rows, and MITC shear tying rows; `step9.md` is complete and revalidated plane-stress material, convected-to-local transform, and `2 x 2 x 2` material integration scaffolding; `step10.md` is complete and revalidated MITC4 stiffness, internal force, six-DOF transform, and drilling stabilization; `step11.md` is complete and added MITC4 membrane, bending, shear, twist, drilling-sensitivity, and thin-cantilever locking-sensitivity tests; `step12.md` is complete and revalidated full-space assembly, reduced projection, deterministic sparse-pattern scaffold, solver adapter injection, and full-vector internal/reaction force state; `step13.md` is complete and revalidated active AnalysisModel construction plus input-to-AnalysisState-to-U/RF result workflow; `step14.md` is complete and added the first stored Abaqus displacement regression for `quad_02_phase1`; `step15.md` is complete and recorded the independent evaluator closeout in `phases/1-linear-static-mitc4-rebaseline/step15-evaluator-report.md`. - Every step file contains a sprint contract with objective, required reading, scope, allowed files, explicit non-goals, tests to write first, reference artifacts, acceptance command, evaluator checklist, and handoff requirements. - Historical phase directory: `phases/1-linear-static-mitc4` - Historical phase status: blocked/superseded. Do not resume the old P1-15/P1-16 path unless the user explicitly requests recovery of that exact phase. @@ -77,7 +77,7 @@ Each gate should be satisfied before moving to the next implementation band unle | G2 - Parser and domain | satisfied | Parser subset revalidated in step 3; validation and singular diagnostics revalidated in step 4. | Parser acceptance/rejection tests, validation negative tests, and validation output | | G3 - DOF/math/results infrastructure | satisfied | Core aliases, DOF mapping, validation harness, model diagnostic context, DofManager, sparse-connectivity inputs, full-vector reaction formula, result model metadata, displacement CSV comparator, full-space assembly, reduced projection, sparse-pattern scaffold, and solver adapter boundary were revalidated in steps 2, 5, 6, and 12. | P1R-02, P1R-05, P1R-06, and P1R-12 validation output | | G4 - MITC4 element readiness | satisfied | MITC4 formulation was rewritten from local papers; Steps 7 through 11 rebuilt geometry/director/local-basis scaffolding, displacement interpolation, direct covariant strain rows, MITC shear tying rows, plane-stress material, convected-to-local transform, `2 x 2 x 2` material integration scaffolding, stiffness/internal force, six-DOF transform, drilling stabilization, and patch/locking-sensitivity tests. | P1R-07 through P1R-11 validation output | -| G5 - End-to-end solver | satisfied-with-gap | Linear static input-to-result workflow is revalidated through step 13, and `quad_02_phase1` stored displacement regression passes in step 14. The broader PRD target of three stored references remains open in R-013. | P1R-13 and P1R-14 validation output | +| G5 - End-to-end solver | satisfied-with-gap | Linear static input-to-result workflow is revalidated through step 13, `quad_02_phase1` stored displacement regression passes in step 14, and the rebaseline evaluator closeout passed in step 15. The broader PRD target of three stored references remains open in R-013. | P1R-13 through P1R-15 validation output | ## Phase 1 Implementation Milestones All milestones are intended to become one or more self-contained sprint contracts or `phases/{phase}/stepN.md` files. Each sprint must follow `docs/HARNESS_ENGINEERING.md` and be evaluated independently. @@ -96,7 +96,7 @@ All milestones are intended to become one or more self-contained sprint contract | P1R-12 | completed | assembly generator | Rebuild assembly, solver adapter boundary, constrained solve, and full-vector RF recovery. | P1R-05, P1R-10 | Assembly and full-vector reaction tests | | P1R-13 | completed | analysis generator | Rebuild linear static workflow from input to U/RF result fields. | P1R-03, P1R-04, P1R-06, P1R-12 | End-to-end linear static tests | | P1R-14 | completed | reference generator | Run stored reference displacement regression using accepted Phase 1-compatible S4 cases. | P1R-13 | At least one automated CSV displacement regression | -| P1R-15 | pending | evaluator | Independent Phase 1 evaluator closeout. | P1R-14 | Pass/fail report, synchronized PLAN/PROGRESS | +| P1R-15 | completed | evaluator | Independent Phase 1 evaluator closeout. | P1R-14 | Pass/fail report, synchronized PLAN/PROGRESS | ## Phase 1 Sprint Contract Rules Every implementation milestone above must be decomposed into one or more contracts before code changes begin. diff --git a/PROGRESS.md b/PROGRESS.md index 0ec5ce8..f4e7c77 100644 --- a/PROGRESS.md +++ b/PROGRESS.md @@ -13,10 +13,34 @@ Every new agent session must read this file together with `PLAN.md` before plann - Do not remove history unless the user explicitly asks for archival cleanup. ## Current Status -Phase 1 has a new rebaseline phase definition in `phases/1-linear-static-mitc4-rebaseline`. Steps 0 through 14 are complete. `quad_02_phase1.inp` is now the normalized Phase 1-compatible input path for the stored `quad_02` S4 reference pair, while the original `quad_02.inp` remains preserved unsupported provenance. Core numeric aliases, DOF mapping, validation harness, model diagnostic context, the Phase 1 parser/domain subset, validation/singular diagnostics, DofManager/reaction foundation, minimum result model metadata, displacement CSV comparator foundation, MITC4 geometry/director scaffolding, MITC4 displacement/strain/tying row scaffolding, MITC4 material/transform/integration scaffolding, MITC4 stiffness/drilling/internal-force scaffolding, MITC4 patch/locking-sensitivity tests, full-space assembly, reduced projection, sparse-pattern scaffold, solver adapter injection, full-vector internal/reaction force state, active AnalysisModel construction, input-to-AnalysisState-to-U/RF result workflow, and the first stored Abaqus displacement regression have been revalidated. The old `phases/1-linear-static-mitc4` path is historical and superseded after the MITC4 formulation reset. +Phase 1 has a completed rebaseline execution path in `phases/1-linear-static-mitc4-rebaseline`. Steps 0 through 15 are complete, and P1R-15 recorded a pass-with-documented-gaps evaluator closeout. `quad_02_phase1.inp` is now the normalized Phase 1-compatible input path for the stored `quad_02` S4 reference pair, while the original `quad_02.inp` remains preserved unsupported provenance. Core numeric aliases, DOF mapping, validation harness, model diagnostic context, the Phase 1 parser/domain subset, validation/singular diagnostics, DofManager/reaction foundation, minimum result model metadata, displacement CSV comparator foundation, MITC4 geometry/director scaffolding, MITC4 displacement/strain/tying row scaffolding, MITC4 material/transform/integration scaffolding, MITC4 stiffness/drilling/internal-force scaffolding, MITC4 patch/locking-sensitivity tests, full-space assembly, reduced projection, sparse-pattern scaffold, solver adapter injection, full-vector internal/reaction force state, active AnalysisModel construction, input-to-AnalysisState-to-U/RF result workflow, and the first stored Abaqus displacement regression have been revalidated. Full PRD Phase 1 completion still depends on the open reference gaps R-010 and R-013. The old `phases/1-linear-static-mitc4` path is historical and superseded after the MITC4 formulation reset. ## Completed Work +### 2026-05-04 - P1R-15 evaluator closeout completed +Author: Codex + +Changed files: +- `phases/1-linear-static-mitc4-rebaseline/step15-evaluator-report.md` +- `phases/1-linear-static-mitc4-rebaseline/index.json` +- `phases/index.json` +- `PLAN.md` +- `PROGRESS.md` + +Summary: +- Performed the independent closeout review for the `1-linear-static-mitc4-rebaseline` phase. +- Recorded a PASS verdict for the rebaseline sprint sequence, with product-level Phase 1 reference gaps explicitly documented instead of silently approved. +- Marked P1R-15 complete and marked the rebaseline phase complete in the phase registry. +- Updated `PLAN.md` so the next work is closing R-010 and R-013 before claiming full PRD Phase 1 completion. + +Verification: +- `python scripts/validate_workspace.py` configured CMake, built `fesa_core` and `fesa_tests`, and ran CTest successfully. +- CTest result: 1 test executable passed. + +Follow-up: +- R-010 remains open: add Abaqus reaction-force CSV artifacts, preferably `*_reactions.csv`, or explicitly adopt internal equilibrium tests as the Phase 1 RF verification basis until Abaqus RF output is available. +- R-013 remains open: add enough additional small Abaqus S4 reference cases for the PRD target of three stored references: one single-element case, one simple multi-element plate/shell case, and one curved shell benchmark. + ### 2026-05-04 - P1R-14 stored reference regression completed Author: Codex @@ -821,6 +845,7 @@ Verification: ## Known Blockers - No reaction-force reference artifact exists yet under `references/`. +- The PRD target of three stored Phase 1 reference cases is not yet satisfied; only `quad_02_phase1` is an active stored displacement regression. - The current initial `quad_01.inp` reference contains `S4R`, `Part/Assembly/Instance`, `*Density`, and `NLGEOM=YES`, so it is not a Phase 1 parser acceptance case as-is. ## Current Risks diff --git a/phases/1-linear-static-mitc4-rebaseline/index.json b/phases/1-linear-static-mitc4-rebaseline/index.json index bbbff8d..0f3f843 100644 --- a/phases/1-linear-static-mitc4-rebaseline/index.json +++ b/phases/1-linear-static-mitc4-rebaseline/index.json @@ -17,6 +17,6 @@ { "step": 12, "name": "assembly-sparse-solver-path", "status": "completed" }, { "step": 13, "name": "linear-static-workflow", "status": "completed" }, { "step": 14, "name": "stored-reference-regression", "status": "completed" }, - { "step": 15, "name": "phase1-evaluator-closeout", "status": "pending" } + { "step": 15, "name": "phase1-evaluator-closeout", "status": "completed", "artifact": "step15-evaluator-report.md" } ] } diff --git a/phases/1-linear-static-mitc4-rebaseline/step15-evaluator-report.md b/phases/1-linear-static-mitc4-rebaseline/step15-evaluator-report.md new file mode 100644 index 0000000..d06033c --- /dev/null +++ b/phases/1-linear-static-mitc4-rebaseline/step15-evaluator-report.md @@ -0,0 +1,59 @@ +# Evaluation Report: P1R-15 Phase 1 Rebaseline Closeout + +Date: 2026-05-04 +Evaluator: Codex + +## Verdict + +PASS for the `1-linear-static-mitc4-rebaseline` sprint sequence, with documented product-level Phase 1 reference gaps. + +This verdict closes the rebaseline execution path through P1R-15. It does not claim that the broader PRD Phase 1 reference target is fully complete, because R-010 and R-013 remain open in `PLAN.md`. + +## Scope Reviewed + +- `AGENTS.md` +- `PLAN.md` +- `PROGRESS.md` +- `docs/README.md` +- `docs/HARNESS_ENGINEERING.md` +- `docs/PRD.md` +- `docs/ARCHITECTURE.md` +- `docs/ADR.md` +- `docs/NUMERICAL_CONVENTIONS.md` +- `docs/ABAQUS_INPUT_SUBSET.md` +- `docs/VERIFICATION_PLAN.md` +- `docs/RESULTS_SCHEMA.md` +- `docs/MITC4_FORMULATION.md` +- `phases/index.json` +- `phases/1-linear-static-mitc4-rebaseline/index.json` +- Completed rebaseline handoff notes in `PROGRESS.md` + +## Evidence + +- Rebaseline steps P1R-00 through P1R-14 were already marked complete before this evaluation. +- `python scripts/validate_workspace.py` passed on 2026-05-04. The command configured CMake, built `fesa_core` and `fesa_tests`, and ran CTest successfully. +- The active stored reference regression uses `references/quad_02_phase1.inp` and compares FESA `U` against `references/quad_02_displacements.csv`. +- The original `references/quad_02.inp` remains preserved as Abaqus/CAE provenance and is not treated as parser acceptance evidence for `Part/Assembly/Instance`. +- `RF` is recovered from the full vector path and covered by in-repo equilibrium/reaction tests; no Abaqus `*_reactions.csv` artifact is available yet. + +## Checklist + +| Item | Result | Notes | +|---|---|---| +| AGENTS critical rules satisfied | PASS | PLAN/PROGRESS were read before edits, architecture/numerical/reference rules were checked, and Abaqus execution was not required. | +| Harness contract followed | PASS | Step 15 stayed inside the allowed evaluation/documentation scope and did not implement missing solver behavior. | +| TDD expectations met for implementation steps | PASS | Earlier generator steps recorded failing-first or test-first validation where code was changed; Step 15 is evaluator-only. | +| MITC4 formulation alignment | PASS | Rebaseline steps 7 through 11 are tied to the paper-based formulation document and current drilling scale policy. | +| Parser subset discipline | PASS | Unsupported Abaqus/CAE provenance remains documented instead of silently expanding the Phase 1 parser subset. | +| Full-vector RF recovery | PASS with reference gap | Implementation path preserves full-space stiffness/load state and tests full-vector RF recovery. Abaqus RF CSV comparison remains open as R-010. | +| Stored displacement reference regression | PASS with PRD gap | `quad_02_phase1` displacement comparison passes. The PRD target of three stored references remains open as R-013. | +| PLAN/PROGRESS synchronized | PASS | Step 15 updates move the active objective to post-rebaseline reference completion. | + +## Residual Gaps + +- R-010: Add Abaqus reaction-force CSV artifacts, preferably `*_reactions.csv`, or explicitly accept internal equilibrium tests as the Phase 1 RF verification basis until Abaqus RF output is available. +- R-013: Add enough additional small Abaqus S4 reference cases to satisfy the PRD target of three stored Phase 1 references: one single-element case, one simple multi-element plate/shell case, and one curved shell benchmark. + +## Closeout Decision + +Mark `phases/1-linear-static-mitc4-rebaseline` complete. Continue project work from `PLAN.md` with R-010 and R-013 as the next reference-readiness tasks before claiming full PRD Phase 1 completion. diff --git a/phases/index.json b/phases/index.json index 432c3ed..f75a696 100644 --- a/phases/index.json +++ b/phases/index.json @@ -7,7 +7,8 @@ }, { "dir": "1-linear-static-mitc4-rebaseline", - "status": "pending" + "status": "completed", + "completion_note": "P1R-15 evaluator closeout passed on 2026-05-04. Product-level Phase 1 reference gaps R-010 and R-013 remain tracked in PLAN.md." } ] }