diff --git a/docs/build-test-reports/linear-static-3d-euler-beam.md b/docs/build-test-reports/linear-static-3d-euler-beam.md new file mode 100644 index 0000000..e377619 --- /dev/null +++ b/docs/build-test-reports/linear-static-3d-euler-beam.md @@ -0,0 +1,238 @@ +# Linear Static 3D Euler Beam Build/Test Report + +## Metadata + +- feature_id: `linear-static-3d-euler-beam` +- source_commit: `400db191ce9f766ca6b34e5b609eaa13c54ccfa3` +- source_implementation_report: `docs/implementation-plans/linear-static-3d-euler-beam-implementation-report.md` +- source_implementation_plan: `docs/implementation-plans/linear-static-3d-euler-beam.md` +- status: `pass-for-reference-verification` +- owner_agent: `build-test-executor-agent` +- date: `2026-08-09` +- evidence_window: `2026-08-09T23:16:20.8670416+09:00` through `2026-08-09T23:20:15.7264584+09:00` + +## Verdict + +Fresh Visual Studio 18 2026/MSVC x64 Debug configuration, a clean full rebuild, +the exact Step 25 configure/build commands, nonzero JSON discovery, the feature-label +CTest run, and the full CTest run all passed. CTest discovered the expected 83 tests +and both executed suites passed 83/83. The clean rebuild emitted no compiler or linker +warning line, and generated FESA product projects retain Level 4 plus warnings-as-errors. + +The build/test gate therefore passes for handoff to Step 26 Reference Verification. +This verdict does not approve reference tolerance, physics sanity, or release readiness. + +## Execution Environment + +- os: `Microsoft Windows 11 Home 10.0.26200 build 26200; 64-bit` +- source_head: `400db191ce9f766ca6b34e5b609eaa13c54ccfa3` +- generator: `Visual Studio 18 2026` +- Visual Studio: `Community 18.8.2` (`18.8.12023.21`) +- MSBuild: `18.8.2+ce25c0108` +- compiler: `MSVC 19.51.36252.0` +- compiler_architecture: `x64` +- Windows SDK: `10.0.26100.0` +- language: `C++17`, required, extensions disabled +- config: `Debug` +- build_dir: `.harness/build` +- harness_config: absent; repository auto-CMake defaults plus Step 25 explicit cache values +- project_selection: auto CMake from root `CMakeLists.txt` +- command_discovery_path: default CMake/MSVC x64 Debug with explicit local dependency paths +- CMake / CTest: `4.4.0 / 4.4.0` + +### Dependency Revisions + +| dependency | resolved revision or version | evidence | +| --- | --- | --- | +| GoogleTest | `04ee1b4f2aefdffb0135d7cf2a2c519fe50dabe4` | clean `C:/git/googletest` checkout HEAD | +| Intel oneMKL | `2026.1.0` | `MKLConfigVersion.cmake`; configure reported `MKL_VERSION: 2026.1.0`, dynamic ILP64, Intel threading | +| Intel oneTBB | `2023.1.0` | `TBBConfigVersion.cmake` from the configured `2023.1` package | +| HDF5 | `2.1.1` | `hdf5-config-version.cmake` from the configured `2.1.1` package | + +## Freshness and Configuration Resolution + +The ignored generated build tree already existed. Fresh evidence was obtained without +reusing its cache or products by running CMake `--fresh` with the generator explicitly +fixed to Visual Studio 18 2026, then running the generated `clean` target before the +full build. The literal no-`--fresh`, no-`-G` configure command from Step 25 was then +run against that resolved VS18 cache and followed by the literal build, discovery, +feature-label, and full-test commands. + +Post-configure metadata recorded: + +- `CMAKE_GENERATOR=Visual Studio 18 2026` +- `CMAKE_GENERATOR_PLATFORM=x64` +- `CMAKE_CXX_COMPILER_ID=MSVC` +- `CMAKE_CXX_COMPILER_VERSION=19.51.36252.0` +- `CMAKE_CXX_COMPILER_ARCHITECTURE_ID=x64` + +## Command Log Summary + +| order | command | start / end | exit code | duration | verdict and stdout/stderr tail | +| ---: | --- | --- | ---: | ---: | --- | +| 1 | `cmake --fresh -S . -B .harness/build -G "Visual Studio 18 2026" -A x64 -DFESA_GTEST_SOURCE_DIR=C:/git/googletest "-DMKL_DIR=C:/Program Files (x86)/Intel/oneAPI/mkl/2026.1/lib/cmake/mkl" "-DTBB_DIR=C:/Program Files (x86)/Intel/oneAPI/tbb/2023.1/lib/cmake/tbb" "-DHDF5_DIR=C:/Program Files/HDF_Group/HDF5/2.1.1/cmake"` | `23:16:20.867+09:00` / `23:16:27.706+09:00` | 0 | `6.836 s` | pass; MKL 2026.1.0 and required runtime libraries resolved; `Configuring done`, `Generating done`, build files written to `.harness/build` | +| 2 | `cmake --build .harness/build --config Debug --target clean` | `23:16:37.194+09:00` / `23:16:37.914+09:00` | 0 | `0.716 s` | pass; generated VS18 clean target completed | +| 3 | `cmake --build .harness/build --config Debug` | `23:16:47.054+09:00` / `23:18:01.769+09:00` | 0 | `74.713 s` | pass; clean compile/link produced `fesa.exe` and all three test executables; warning scan count `0` | +| 4 | `cmake -S . -B .harness/build -A x64 -DFESA_GTEST_SOURCE_DIR=C:/git/googletest "-DMKL_DIR=C:/Program Files (x86)/Intel/oneAPI/mkl/2026.1/lib/cmake/mkl" "-DTBB_DIR=C:/Program Files (x86)/Intel/oneAPI/tbb/2023.1/lib/cmake/tbb" "-DHDF5_DIR=C:/Program Files/HDF_Group/HDF5/2.1.1/cmake"` | `23:19:10.210+09:00` / `23:19:10.861+09:00` | 0 | `0.649 s` | pass; exact Step 25 command selected Windows SDK 10.0.26100.0, retained VS18/x64, and completed configure/generate | +| 5 | `cmake --build .harness/build --config Debug` | `23:19:25.404+09:00` / `23:19:28.969+09:00` | 0 | `3.562 s` | pass; exact Step 25 build confirmed `fesa_solver`, `fesa.exe`, and all test executables; warning scan count `0` | +| 6 | `ctest --test-dir .harness/build -C Debug --show-only=json-v1` | `23:19:45.728+09:00` / `23:19:45.798+09:00` | 0 | `0.065 s` | pass; JSON kind `ctestInfo` version 1.0; 83 tests; every test has the feature label | +| 7 | `ctest --test-dir .harness/build -C Debug -L linear-static-3d-euler-beam --output-on-failure` | `23:20:00.199+09:00` / `23:20:04.163+09:00` | 0 | `3.961 s` | pass; `100% tests passed out of 83`; real test time `3.92 s` | +| 8 | `ctest --test-dir .harness/build -C Debug --output-on-failure` | `23:20:11.899+09:00` / `23:20:15.726+09:00` | 0 | `3.825 s` | pass; `100% tests passed out of 83`; real test time `3.79 s` | + +An initial post-clean discovery/feature/full smoke was also run before the literal +configure replay: discovery exit 0 in `0.068 s` with 83 tests, feature-label CTest +exit 0 in `4.244 s` with 83/83, and full CTest exit 0 in `4.011 s` with 83/83. +Rows 4 through 8 are the final canonical Step 25 acceptance chain. + +## Validation Results + +| validation_stage | result | evidence | +| --- | --- | --- | +| harness self-test | skipped | No Harness Python, Hook, or agent-config file is part of HEAD `400db19` verification scope. | +| fresh configure | pass | Explicit VS18/x64 `--fresh` configure exit 0, followed by clean target exit 0. | +| exact configure | pass | Literal Step 25 configure exit 0; generated metadata is MSVC/x64. | +| clean full build | pass | Exit 0 after clean; all source and test translation units compiled and linked. | +| exact build | pass | Exit 0; product and three test executables confirmed. | +| compiler/warning policy | pass | `fesa_solver` and `fesa_cli` generated projects have `Level4` and `TreatWarningAsError=true`; clean and exact build scans found zero warning lines. | +| CTest discovery | pass | Exit 0; 83 tests, greater than zero and equal to the expected inventory. | +| feature-specific tests | pass | Label `linear-static-3d-euler-beam`: 83/83 passed. | +| full CTest | pass | 83/83 passed with zero failed tests. | +| reference immutability | pass | Pre/post `git diff --exit-code -- reference/` exit 0, status empty, and four exact SHA-256 values unchanged. | +| source worktree before report | pass | `git status --short` empty at HEAD `400db19`. | + +## CTest Inventory + +### Label Inventory + +| label | count | +| --- | ---: | +| `linear-static-3d-euler-beam` | 83 | +| `unit` | 73 | +| `integration` | 5 | +| `reference` | 5 | + +### Suite Inventory and Step Trace + +| implementation Step | CTest suite or suites | count | cumulative count | Step 7-24 report evidence audit | +| ---: | --- | ---: | ---: | --- | +| 7 | `BuildInfo` | 2 | 2 | pass | +| 8 | `CoreDiagnostics` | 3 | 5 | pass | +| 9 | `DenseMath` | 2 | 7 | pass | +| 10 | `DomainModel` | 3 | 10 | pass | +| 11 | `InpSyntax` | 4 | 14 | pass | +| 12 | `InpDomainMapping` | 5 | 19 | pass | +| 13 | `AnalysisModel` | 3 | 22 | pass | +| 14 | `DofManager` | 4 | 26 | pass | +| 15 | `AnalysisState` | 3 | 29 | pass | +| 16 | `EulerBeam3D` | 10 | 39 | pass | +| 17 | `ParallelFor` | 3 | 42 | pass | +| 18 | `SparseAssembly` | 5 | 47 | pass | +| 19 | `EssentialConstraints` | 4 | 51 | pass | +| 20 | `MklPardisoSolver` | 6 | 57 | pass | +| 21 | `LoadAssembly` | 5 | 62 | pass | +| 22 | `ResultRecovery` | 6 | 68 | pass | +| 23 | `Hdf5ResultsWriter` | 5 | 73 | pass | +| 24 | `LinearStaticCli` (5), `ReferenceComparisonContract` (4), `B33ReferenceComparison` (1) | 10 | 83 | pass | + +The JSON inventory contains every exact test name registered by GoogleTest discovery. +No duplicate CTest name was observed; the label partition is exactly 73 unit + 5 +integration + 5 reference = 83. + +## Step 7-24 Implementation Evidence Audit + +The cumulative implementation report was checked block-by-block against the implementation +plan and the phase index summaries. All 18 Step blocks are present and each records: + +- its matching `TASK-07` through `TASK-24`, `status: completed`, changed files, + requirement IDs, and test IDs; +- at least one implementation-owned nonzero RED command with the expected missing API + or named behavioral failure; +- a zero-exit GREEN build/test for the Step's targeted CTest suite; +- zero-exit MSVC x64 configure/build, nonzero JSON discovery, and zero-failure full CTest; +- `/W4 /WX` or equivalent generated warning-policy evidence and reference-tree + immutability evidence. + +Step 20 and Step 22 additionally retain valid behavioral RED/GREEN correction evidence. +Step 23 records its environment link incident separately from the valid missing-API RED, +so the environment incident was not counted as TDD evidence. The cumulative counts in the +implementation report and the Step 7-24 phase summaries progress exactly to the freshly +discovered 83-test inventory above. + +The implementation report's cumulative header still says `in-progress`; the audited +step-local evidence contract and phase index nevertheless mark every implementation Step +7-24 `completed`. This stale aggregate header is not a missing Step block, missing test, +or failed build/test gate and was not modified by the independent executor. + +## `/W4 /WX` and Warning Audit + +- `src/fesa/CMakeLists.txt` applies `/W4 /WX` privately to `fesa_solver` and `fesa_cli`. +- Generated `fesa_solver.vcxproj` and `fesa_cli.vcxproj` contain + `Level4` and + `true` for Debug and the other generated + configurations. +- The clean 74.713-second build recompiled the product and all test translation units; + its compiler/linker warning scan found `0` lines. +- The exact post-configure build also exited 0 and found `0` warning lines. + +Result: no product warning was emitted, and any MSVC product warning would have failed +the build under `/WX`. + +## Reference Read-Only Audit + +The following SHA-256 values were identical before and after all configure/build/test +commands, while both reference diff checks exited 0 and both reference status checks +were empty: + +| exact approved legacy path | SHA-256 | +| --- | --- | +| `reference/cantilever beam/cantilever beam.inp` | `E406EA9560321B791DB829E03BD24593B9875E0195D35B86BD931EDA122EF3` | +| `reference/cantilever beam/cantilever beam displacements.csv` | `7B3312FBC8848E81D9A0FD4FF2B56BC1954636A2C14B5C1CBB269CB9477D3C31` | +| `reference/cantilever beam/cantilever beam reactions.csv` | `BF30CDB0CD50106885DE14D63492737736C587426EBD787DE4F7EE6AA86DAA23` | +| `reference/cantilever beam/cantilever beam elemental forces.csv` | `E5E77FEC0FA9482AE018DBF296E74D396335C7C711BD2E9AA2315247A34290BA` | + +## Failure Classification + +- classification: `N/A` +- primary_failure: `N/A` +- first_failed_command: `N/A` +- evidence_tail: All required configure, build, discovery, feature-label, and full-test + commands exited 0; no failed test exists. +- correction_handoff: `N/A`; no implementation-owned, environment, harness, or + upstream-contract failure requires correction. + +## Failed Test Inventory + +None. Feature-label CTest and full CTest both passed 83/83. + +## Handoff Recommendation + +| target_agent | reason | required_input | +| --- | --- | --- | +| Reference Verification Agent | Step 25 build/test gate is `pass-for-reference-verification`. | This report, HEAD `400db19`, `.harness/build/tests/Debug/fesa_reference_tests.exe`, and the unchanged exact legacy bundle. | + +The build-local Step 24 evidence exists at +`.harness/build/reference/cantilever-beam-b33/results.h5` and +`.harness/build/reference/cantilever-beam-b33/comparison.json`; the JSON is 128,118 bytes +with SHA-256 +`258347AEA791D981AEA9B2BCAD85DE5344D4859ECA3692DC5E7AA01A848F8E0D`. +Step 26 must independently rerun and inspect the approved comparison evidence. Its +presence and CTest success here are not a reference-verification verdict. + +## No-Change Assertion + +- source_files_modified: `false` +- test_files_modified: `false` +- cmake_files_modified: `false` +- requirements_or_upstream_contracts_modified: `false` +- reference_artifacts_modified: `false` +- tolerance_policies_modified: `false` +- owned_report_modified: `true` +- phase_index_step25_modified: `true` +- notes: Before report/index creation the worktree was clean at the audited HEAD. Final + scope validation is limited to this report and the Step 25 fields in the phase index. + +## Open Issues + +- None blocking Reference Verification. +- The implementation report aggregate `in-progress` header is noted above but does not + contradict its 18 completed Step blocks, the phase index, or the fresh build/test result.