modify documents

This commit is contained in:
KOKO\Mimi
2026-09-05 15:14:21 +09:00
parent 31dac85192
commit 97e4d7a971
79 changed files with 4570 additions and 2787 deletions
@@ -0,0 +1,26 @@
# Evidence and Handoff Contract
Use [Feature document management](../../../../docs/FEATURE_DOCUMENTATION.md) for concise main reports,
linked details, and Coordinator's document inventory. Include main and required detail paths in evidence.
Every stage returns one envelope:
| Field | Required content |
| --- | --- |
| `feature_id` | Stable feature identifier |
| `stage` | `requirements`, `research`, `formulation`, `numerical-review`, `io-definition`, `implementation-planning`, `implementation`, `correction`, `physics-evaluation`, or `release-readiness` |
| `outcome` | `pass`, `return-upstream`, `retry`, `blocked-environment`, or `needs-user-decision` |
| `next_owner` | Agent id, or YAML `null` |
| `evidence_paths` | Repository-relative artifacts used or produced |
| `evidence_digest` | Concise findings tied to requirement IDs |
| `failure_classification` | `configure`, `compile`, `link`, `test`, `reference-comparison`, `harness`, `environment`, `upstream-contract`, `physics`, `evidence`, or YAML `null` |
| `retry_key` | `<feature-id>\|<failing-gate>\|<classification>\|<contract-revision>`, or YAML `null` |
| `attempt` | Coordinator-managed nonnegative attempt count for the retry key |
| `escalation_class` | Critical-decision class, or YAML `null` |
| `blocker` | Actionable blocker, or YAML `null` |
Evidence records include, when applicable: source locator and access date; assumptions; command, exit code, duration, and relevant output; test identity and RED/GREEN result; artifact hash; comparison quantity, tolerance source, and decision; residual risk.
Use repository-relative paths and stable identifiers. Distinguish observed facts, calculations, inferences, and decisions. Never report a pass when a required command failed, evidence is stale, or a blocking acceptance item is unresolved.
Retry is bounded by the coordinator policy. A repeated normalized failure returns to its owning stage; it does not justify changing requirements, formulations, schemas, reference artifacts, or tolerances.
@@ -0,0 +1,33 @@
# Workflow and Decision Authority
## Authority order
Use the first applicable authority:
1. Approved feature contract and explicit user decisions
2. Governing physics, mathematics, standards, and safety obligations
3. Official documentation and verification cases for a project-selected reference product or format
4. Repository architecture decisions, configuration, and established conventions
5. The simplest deterministic choice that preserves the authorities above
A commercial solver is a behavioral reference only when the project contract selects it. Its public input semantics, output definitions, documented procedures, and verification examples may support decisions; never infer undocumented internals or claim implementation equivalence.
## Autonomous decisions
Proceed without user review for reversible choices within approved contracts: internal naming and data layout, test organization, diagnostics, equivalent implementation mechanics, documentation formatting, and correction of clear build or test defects. Record assumptions that affect interpretation.
## User decisions
Return `needs-user-decision` only for a choice that changes at least one of:
- supported physics, formulation meaning, or analysis scope;
- public compatibility or an authoritative I/O schema;
- acceptance choices where reasonable criteria split the same evidence between pass and fail and change product acceptance or a public accuracy promise, or where authoritative requirements and reference evidence cannot be reconciled technically;
- a material security/trust-boundary or credential-handling change, or acceptance of an unresolved security, legal, licensing, or compliance risk;
- external reference-solver execution, destructive history changes, publication, deployment, or release.
Everything else follows the authority order. Lack of a preference is not a blocker when a deterministic in-contract choice exists.
## Contract flow
Requirements own acceptance intent; research owns evidence; formulation owns mathematics; numerical review owns independent numerical findings and logical verification coverage; I/O owns external/internal mappings; implementation owns code and tests; physics review owns physical plausibility; release review owns closure evidence. A downstream stage returns a defect to the owning upstream stage instead of silently rewriting its contract.