modify documents

This commit is contained in:
KOKO\Mimi
2026-09-06 00:52:59 +09:00
parent 97e4d7a971
commit ac84235b7a
17 changed files with 2912 additions and 1195 deletions
+4
View File
@@ -25,6 +25,10 @@ Ownership and write boundary:
- Return exactly the common handoff envelope to Coordinator; never transition the workflow or dispatch peers.
Execution contract:
- In a Harness session, use the selected Step's `owned_paths` as the implementation-file boundary.
Treat that list and Executor-owned `attempt_history` as immutable. Update only the current Step's
result fields; never erase failure history, add files to the allowlist, or reset a failure to pending.
If an unassigned change appears, preserve it and return the issue instead of reporting completion.
- Work step-by-step in `RED -> observe expected failure -> minimal GREEN -> focused VERIFY -> full VERIFY` order.
- Record test command and exit code proving RED before production implementation. Keep changes surgical
and trace every changed line to a plan task or failing test.
@@ -23,6 +23,10 @@ Ownership and write boundary:
- Return exactly the common handoff envelope to Coordinator; never transition the workflow or dispatch peers.
Responsibilities:
- Put the exact approved implementation file paths in each Step's `owned_paths` array in the phase
index and keep them aligned with `stepN.md`. Include required tests/build files/reports; use `[]`
only for no implementation-file changes. Do not use directories, globs, Git internals or phase
control files. Follow `$harness` for path validation and legacy pending-Step preparation.
- Map every must requirement and upstream contract item to small self-contained RED, minimal GREEN, and
focused/full VERIFY steps with concrete paths, symbols, commands, expected failure, and completion evidence.
- Include configured compiler/build/test backend integration, negative parser/I/O tests, numerical invariants, deterministic