{ "project": "FESA Structural Solver", "phase": "shell-surface-pressure-load", "steps": [ { "step": 1, "name": "map-pressure-input-contract", "status": "completed", "started_at": "2026-09-01T11:27:48+0900", "summary": "Mapped assembly element surfaces and additive DSLOAD P records into immutable Domain/Step views with deterministic facet identity.", "completed_at": "2026-09-01T12:34:29+0900" }, { "step": 2, "name": "reject-invalid-pressure-input", "status": "completed", "started_at": "2026-09-01T12:34:30+0900", "summary": "Hardened shell pressure input rejection, target diagnostics, duplicate handling, and atomic mapping coverage.", "completed_at": "2026-09-01T13:11:27+0900" }, { "step": 3, "name": "evaluate-shell-pressure-kernel", "status": "completed", "started_at": "2026-09-01T14:05:23+0900", "summary": "Added a validated reference/current four-node pressure evaluator with exact follower tangent and focused kernel tests.", "completed_at": "2026-09-01T14:31:41+0900" }, { "step": 4, "name": "integrate-linear-shell-pressure", "status": "completed", "started_at": "2026-09-01T14:31:41+0900", "summary": "Assembled deterministic reference-configuration shell pressure into the linear full-space load path with reaction, schema, and CLI preservation coverage.", "completed_at": "2026-09-01T15:03:28+0900" }, { "step": 5, "name": "integrate-nonlinear-follower-pressure", "status": "completed", "started_at": "2026-09-01T15:03:28+0900", "summary": "Integrated current-configuration follower pressure force and exact external tangent into nonlinear full-Newton trial assembly with schema-1 regression coverage.", "completed_at": "2026-09-01T15:48:52+0900" }, { "step": 6, "name": "compare-pressure-reference", "status": "completed", "started_at": "2026-09-01T15:48:52+0900", "summary": "Added deterministic schema-1 pressure-reference comparison with exact artifact checks, U blocking/UR warning-only projection, and common-tolerance coverage.", "completed_at": "2026-09-01T17:00:55+0900" }, { "step": 7, "name": "verify-and-report-pressure-feature", "status": "completed", "started_at": "2026-09-01T17:00:55+0900", "summary": "Completed Gate 6 pressure reports with fresh MSVC focused validation, immutable artifact audit, FESA-only schema-1 comparison, and U/UR reference evidence.", "completed_at": "2026-09-01T17:43:56+0900" } ], "created_at": "2026-09-01T01:29:29+0900", "completed_at": "2026-09-01T17:43:57+0900" }