# Evaluation Report: P1R-15 Phase 1 Rebaseline Closeout Date: 2026-05-04 Evaluator: Codex ## Verdict PASS for the `1-linear-static-mitc4-rebaseline` sprint sequence, with documented product-level Phase 1 reference gaps. This verdict closes the rebaseline execution path through P1R-15. It does not claim that the broader PRD Phase 1 reference target is fully complete, because R-010 and R-013 remain open in `PLAN.md`. ## Scope Reviewed - `AGENTS.md` - `PLAN.md` - `PROGRESS.md` - `docs/README.md` - `docs/HARNESS_ENGINEERING.md` - `docs/PRD.md` - `docs/ARCHITECTURE.md` - `docs/ADR.md` - `docs/NUMERICAL_CONVENTIONS.md` - `docs/ABAQUS_INPUT_SUBSET.md` - `docs/VERIFICATION_PLAN.md` - `docs/RESULTS_SCHEMA.md` - `docs/MITC4_FORMULATION.md` - `phases/index.json` - `phases/1-linear-static-mitc4-rebaseline/index.json` - Completed rebaseline handoff notes in `PROGRESS.md` ## Evidence - Rebaseline steps P1R-00 through P1R-14 were already marked complete before this evaluation. - `python scripts/validate_workspace.py` passed on 2026-05-04. The command configured CMake, built `fesa_core` and `fesa_tests`, and ran CTest successfully. - The active stored reference regression uses `references/quad_02_phase1.inp` and compares FESA `U` against `references/quad_02_displacements.csv`. - The original `references/quad_02.inp` remains preserved as Abaqus/CAE provenance and is not treated as parser acceptance evidence for `Part/Assembly/Instance`. - `RF` is recovered from the full vector path and covered by in-repo equilibrium/reaction tests; no Abaqus `*_reactions.csv` artifact is available yet. ## Checklist | Item | Result | Notes | |---|---|---| | AGENTS critical rules satisfied | PASS | PLAN/PROGRESS were read before edits, architecture/numerical/reference rules were checked, and Abaqus execution was not required. | | Harness contract followed | PASS | Step 15 stayed inside the allowed evaluation/documentation scope and did not implement missing solver behavior. | | TDD expectations met for implementation steps | PASS | Earlier generator steps recorded failing-first or test-first validation where code was changed; Step 15 is evaluator-only. | | MITC4 formulation alignment | PASS | Rebaseline steps 7 through 11 are tied to the paper-based formulation document and current drilling scale policy. | | Parser subset discipline | PASS | Unsupported Abaqus/CAE provenance remains documented instead of silently expanding the Phase 1 parser subset. | | Full-vector RF recovery | PASS with reference gap | Implementation path preserves full-space stiffness/load state and tests full-vector RF recovery. Abaqus RF CSV comparison remains open as R-010. | | Stored displacement reference regression | PASS with PRD gap | `quad_02_phase1` displacement comparison passes. The PRD target of three stored references remains open as R-013. | | PLAN/PROGRESS synchronized | PASS | Step 15 updates move the active objective to post-rebaseline reference completion. | ## Residual Gaps - R-010: Add Abaqus reaction-force CSV artifacts, preferably `*_reactions.csv`, or explicitly accept internal equilibrium tests as the Phase 1 RF verification basis until Abaqus RF output is available. - R-013: Add enough additional small Abaqus S4 reference cases to satisfy the PRD target of three stored Phase 1 references: one single-element case, one simple multi-element plate/shell case, and one curved shell benchmark. ## Closeout Decision Mark `phases/1-linear-static-mitc4-rebaseline` complete. Continue project work from `PLAN.md` with R-010 and R-013 as the next reference-readiness tasks before claiming full PRD Phase 1 completion.