Step 10: mitc4-formulation-closure

Sprint Contract

Objective

Close the MITC4 formulation decisions required before element implementation: transverse shear tying, local basis, integration ordering, drilling stiffness default, and Phase 1 output scope.

Required Reading

  • /AGENTS.md
  • /PROGRESS.md
  • /PLAN.md
  • /docs/README.md
  • /docs/HARNESS_ENGINEERING.md
  • /docs/PRD.md
  • /docs/NUMERICAL_CONVENTIONS.md
  • /docs/RESULTS_SCHEMA.md
  • /docs/MITC4_FORMULATION.md
  • /docs/VERIFICATION_PLAN.md

Scope

  • Update docs/MITC4_FORMULATION.md with the exact baseline formulas and implementation checklist needed for coding.
  • Resolve or explicitly defer R-004, R-005, R-006, and R-007.
  • Record literature/source basis and benchmark expectations without requiring local Abaqus execution.
  • Update ADR or PLAN only when a durable design decision changes.

Allowed Files

  • docs/MITC4_FORMULATION.md
  • docs/RESULTS_SCHEMA.md
  • docs/VERIFICATION_PLAN.md
  • docs/ADR.md
  • PLAN.md
  • PROGRESS.md
  • phases/1-linear-static-mitc4/index.json

Explicit Non-Goals

  • Do not implement C++ MITC4 code in this step.
  • Do not invent formulas from memory without documenting the source or derivation.
  • Do not expand Phase 1 outputs beyond resolved R-007.

Tests To Write First

  • No C++ tests are required unless executable formulation checks already exist.
  • Add documentation checklist items or review notes that can be evaluated before Step 11.

Reference Artifacts

  • None required. Existing references/quad_01* may inform future benchmark planning but is not a Phase 1 MITC4 acceptance case.

Acceptance Commands

python scripts/validate_workspace.py

Evaluator Checklist

  • Transverse shear tying equations are explicit enough to implement.
  • Local shell basis construction is explicit for flat and non-flat quads.
  • Drilling stiffness default scale and parameter name are finalized.
  • Integration ordering and output scope are finalized or explicitly deferred with downstream blockers.
  • Step 11 remains blocked if any required formulation item is unresolved.

Handoff Requirements

  • Record closed decisions and remaining risks in PROGRESS.md.
  • Remove or update resolved readiness tasks in PLAN.md.
  • Update the matching phase index entry: use completed with a one-line summary, or blocked with blocked_reason, or error with error_message.

Verification

  1. Run the acceptance command.
  2. Review docs for implementable formulas and unresolved placeholders.

Do Not

  • Do not let implementation begin on undocumented MITC4 formulas.