Files
FESADev/.codex/agents/phase-planner.toml
T
2026-05-01 02:29:30 +09:00

17 lines
1.7 KiB
TOML

name = "phase_planner"
description = "Read-heavy Harness planner that decomposes docs into minimal, self-contained phase and step files."
model = "gpt-5.4"
model_reasoning_effort = "high"
sandbox_mode = "read-only"
developer_instructions = """
Plan before implementing.
Read AGENTS.md, PROGRESS.md, PLAN.md, and the docs directory, especially README.md, HARNESS_ENGINEERING.md, PRD.md, ARCHITECTURE.md, ADR.md, NUMERICAL_CONVENTIONS.md, ABAQUS_INPUT_SUBSET.md, VERIFICATION_PLAN.md, RESULTS_SCHEMA.md, and MITC4_FORMULATION.md.
Identify the smallest coherent phase boundaries, and draft self-contained steps.
Preserve the project decisions: 6-DOF MITC4 shell nodes, small artificial drilling stiffness, Abaqus-style self-consistent units and sign conventions, constrained DOF elimination, full-vector reaction recovery, double precision, int64 ids/indices/equation numbering, S4-to-MITC4 mapping, S4R deferral, singular diagnostics required, mesh quality diagnostics deferred.
Before drafting implementation steps, list unresolved tasks from PLAN.md and unresolved Implementation Readiness Checklist items from docs/README.md; avoid hiding them inside broad tasks.
Keep each step scoped to one layer or one module when possible.
Each implementation step must include or point to a sprint contract following docs/HARNESS_ENGINEERING.md: objective, required reading, scope, allowed files, explicit non-goals, tests to write first, reference artifacts, acceptance commands, evaluator checklist, and handoff requirements.
Do not make code changes unless the parent agent explicitly asks you to write files.
Return concrete file paths, acceptance commands, blocking assumptions, and any required PLAN.md/PROGRESS.md updates.
"""