3.6 KiB
3.6 KiB
Evaluation Report: P1R-15 Phase 1 Rebaseline Closeout
Date: 2026-05-04 Evaluator: Codex
Verdict
PASS for the 1-linear-static-mitc4-rebaseline sprint sequence, with documented product-level Phase 1 reference gaps.
This verdict closes the rebaseline execution path through P1R-15. It does not claim that the broader PRD Phase 1 reference target is fully complete, because R-010 and R-013 remain open in PLAN.md.
Scope Reviewed
AGENTS.mdPLAN.mdPROGRESS.mddocs/README.mddocs/HARNESS_ENGINEERING.mddocs/PRD.mddocs/ARCHITECTURE.mddocs/ADR.mddocs/NUMERICAL_CONVENTIONS.mddocs/ABAQUS_INPUT_SUBSET.mddocs/VERIFICATION_PLAN.mddocs/RESULTS_SCHEMA.mddocs/MITC4_FORMULATION.mdphases/index.jsonphases/1-linear-static-mitc4-rebaseline/index.json- Completed rebaseline handoff notes in
PROGRESS.md
Evidence
- Rebaseline steps P1R-00 through P1R-14 were already marked complete before this evaluation.
python scripts/validate_workspace.pypassed on 2026-05-04. The command configured CMake, builtfesa_coreandfesa_tests, and ran CTest successfully.- The active stored reference regression uses
references/quad_02_phase1.inpand compares FESAUagainstreferences/quad_02_displacements.csv. - The original
references/quad_02.inpremains preserved as Abaqus/CAE provenance and is not treated as parser acceptance evidence forPart/Assembly/Instance. RFis recovered from the full vector path and covered by in-repo equilibrium/reaction tests; no Abaqus*_reactions.csvartifact is available yet.
Checklist
| Item | Result | Notes |
|---|---|---|
| AGENTS critical rules satisfied | PASS | PLAN/PROGRESS were read before edits, architecture/numerical/reference rules were checked, and Abaqus execution was not required. |
| Harness contract followed | PASS | Step 15 stayed inside the allowed evaluation/documentation scope and did not implement missing solver behavior. |
| TDD expectations met for implementation steps | PASS | Earlier generator steps recorded failing-first or test-first validation where code was changed; Step 15 is evaluator-only. |
| MITC4 formulation alignment | PASS | Rebaseline steps 7 through 11 are tied to the paper-based formulation document and current drilling scale policy. |
| Parser subset discipline | PASS | Unsupported Abaqus/CAE provenance remains documented instead of silently expanding the Phase 1 parser subset. |
| Full-vector RF recovery | PASS with reference gap | Implementation path preserves full-space stiffness/load state and tests full-vector RF recovery. Abaqus RF CSV comparison remains open as R-010. |
| Stored displacement reference regression | PASS with PRD gap | quad_02_phase1 displacement comparison passes. The PRD target of three stored references remains open as R-013. |
| PLAN/PROGRESS synchronized | PASS | Step 15 updates move the active objective to post-rebaseline reference completion. |
Residual Gaps
- R-010: Add Abaqus reaction-force CSV artifacts, preferably
*_reactions.csv, or explicitly accept internal equilibrium tests as the Phase 1 RF verification basis until Abaqus RF output is available. - R-013: Add enough additional small Abaqus S4 reference cases to satisfy the PRD target of three stored Phase 1 references: one single-element case, one simple multi-element plate/shell case, and one curved shell benchmark.
Closeout Decision
Mark phases/1-linear-static-mitc4-rebaseline complete. Continue project work from PLAN.md with R-010 and R-013 as the next reference-readiness tasks before claiming full PRD Phase 1 completion.