2.3 KiB
Workflow and Decision Authority
Authority order
Use the first applicable authority:
- Approved feature contract and explicit user decisions
- Governing physics, mathematics, standards, and safety obligations
- Official documentation and verification cases for a project-selected reference product or format
- Repository architecture decisions, configuration, and established conventions
- The simplest deterministic choice that preserves the authorities above
A commercial solver is a behavioral reference only when the project contract selects it. Its public input semantics, output definitions, documented procedures, and verification examples may support decisions; never infer undocumented internals or claim implementation equivalence.
Autonomous decisions
Proceed without user review for reversible choices within approved contracts: internal naming and data layout, test organization, diagnostics, equivalent implementation mechanics, documentation formatting, and correction of clear build or test defects. Record assumptions that affect interpretation.
User decisions
Return needs-user-decision only for a choice that changes at least one of:
- supported physics, formulation meaning, or analysis scope;
- public compatibility or an authoritative I/O schema;
- acceptance choices where reasonable criteria split the same evidence between pass and fail and change product acceptance or a public accuracy promise, or where authoritative requirements and reference evidence cannot be reconciled technically;
- a material security/trust-boundary or credential-handling change, or acceptance of an unresolved security, legal, licensing, or compliance risk;
- external reference-solver execution, destructive history changes, publication, deployment, or release.
Everything else follows the authority order. Lack of a preference is not a blocker when a deterministic in-contract choice exists.
Contract flow
Requirements own acceptance intent; research owns evidence; formulation owns mathematics; numerical review owns independent numerical findings and logical verification coverage; I/O owns external/internal mappings; implementation owns code and tests; physics review owns physical plausibility; release review owns closure evidence. A downstream stage returns a defect to the owning upstream stage instead of silently rewriting its contract.