Files
FESADev/phases/analysis-model-objects/index.json
T
2026-06-09 09:04:21 +09:00

73 lines
2.4 KiB
JSON

{
"project": "FESA Structural Solver",
"phase": "analysis-model-objects",
"steps": [
{
"step": 0,
"name": "model-object-contract",
"status": "completed",
"summary": "Created analysis model object implementation plan with base-class contracts, exclusions, and TDD traceability."
},
{
"step": 1,
"name": "node-model-class",
"status": "completed",
"summary": "Added Node DOF count contract and tests while keeping Node free of solver state."
},
{
"step": 2,
"name": "element-base-interface",
"status": "completed",
"summary": "Added identity-only Element base interface and model-object CTest target."
},
{
"step": 3,
"name": "mitc4-element-model",
"status": "completed",
"summary": "Added MITC4 element model skeleton with four-node connectivity and 24-DOF count tests."
},
{
"step": 4,
"name": "material-base-interface",
"status": "completed",
"summary": "Added Material base and LinearElasticMaterial model object with ownership tests."
},
{
"step": 5,
"name": "property-section-model",
"status": "completed",
"summary": "Added ShellProperty model object with positive-thickness validation tests."
},
{
"step": 6,
"name": "load-base-interface",
"status": "completed",
"summary": "Added Load base and NodalLoad model object with polymorphic access tests."
},
{
"step": 7,
"name": "boundary-base-interface",
"status": "completed",
"summary": "Added BoundaryCondition base and SinglePointConstraint model object with polymorphic access tests."
},
{
"step": 8,
"name": "domain-polymorphic-ownership",
"status": "completed",
"summary": "Extended Domain with unique_ptr ownership APIs for element, material, load, and boundary model objects while preserving existing definition APIs."
},
{
"step": 9,
"name": "legacy-definition-compatibility",
"status": "completed",
"summary": "Documented compatibility between core definition DTOs and new runtime model object ownership APIs."
},
{
"step": 10,
"name": "validation-report-handoff",
"status": "completed",
"summary": "Recorded build/test evidence, updated project progress, and marked the phase completed."
}
]
}