Sprint Contract: Rebaseline Audit
Objective
Audit the existing Phase 1 implementation against the paper-based docs/MITC4_FORMULATION.md and produce a concrete rework map before changing solver behavior.
Required Reading
- /AGENTS.md
- /PROGRESS.md
- /PLAN.md
- /docs/README.md
- /docs/HARNESS_ENGINEERING.md
- /docs/PRD.md
- /docs/ARCHITECTURE.md
- /docs/ADR.md
- /docs/NUMERICAL_CONVENTIONS.md
- /docs/MITC4_FORMULATION.md
- /phases/1-linear-static-mitc4/index.json
Scope
- Inspect existing C++ implementation and tests only enough to classify what can be retained, rewritten, or deleted in later steps.
- Produce or update planning notes in
PLAN.mdandPROGRESS.md. - If useful, add a short audit artifact under
phases/1-linear-static-mitc4-rebaseline/.
Allowed Files
PLAN.mdPROGRESS.mdphases/1-linear-static-mitc4-rebaseline/
Explicit Non-Goals
- Do not change production C++ behavior.
- Do not rewrite MITC4 formulas.
- Do not unblock stored-reference regression by accepting unsupported Abaqus syntax.
Tests To Write First
- None. This is a planning and audit sprint.
Reference Artifacts
references/quad_01.inpreferences/quad_01_displacements.csvreferences/quad_02.inpreferences/quad_02_displacements.csv
Acceptance Commands
python scripts/validate_workspace.py
Evaluator Checklist
- The audit identifies conflicts with
docs/MITC4_FORMULATION.md, especially old averaged-edge basis,1.0e-6drilling scale, analytic thickness integration, and direct shear evaluation risks. - Future work is assigned to later rebaseline steps instead of being fixed here.
PLAN.mdandPROGRESS.mddescribe the new state without treating the old P1-01 through P1-14 implementation as authoritative.
Handoff Requirements
- Record completed audit work in
PROGRESS.md. - Keep next implementation tasks in
PLAN.mdor later step files.
Do Not
- Do not merge this audit with implementation.
- Do not remove old phase history.